docs: reconcile documentation with reality (P3)

Make the project's documentation match the code and remove the sprawl. The docs
claimed Phase 2.8 (drug interactions) was 'planning/0%' and the backend '~91%
complete' — both wrong: 2.8 is implemented and live, plus the P0/P1 security
and test work is done. Five root CI/CD docs described a 'docker-build' CI job
that was removed; ~18 backend/ status snapshots and ~24 docs/implementation
duplicates cluttered the tree.

Deletions (85 files):
- Root: 4 stale CI/CD reports (CI-CD-{COMPLETION-REPORT,IMPLEMENTATION-SUMMARY,
  STATUS-REPORT,FINAL-STATUS}.md) — all describe the removed docker-build job.
- backend/: 18 phase/build/fix snapshots and code-dump .txt files.
- docs/: the 3 one-time reorg reports; ~17 docs/implementation duplicates and
  process artifacts; 4 stale docs/development CI docs + git snapshots;
  redundant deployment/testing files.
- thoughts/: STATUS.md (said Phase 2.4 in-progress), superseded phase notes and
  duplicative research inputs. tmp/ (928KB of CI debug logs, gitignored).

Moves (18 files):
- 9 genuine decision records -> docs/adr/ (Architecture Decision Records),
  date-prefixes stripped, with an index README.
- 8 historical-but-valuable phase plans/specs + the old CI-CD-FINAL-SOLUTION ->
  docs/archive/ (now-populated, with a README explaining it's superseded
  material). thoughts/ tree removed.

Rewrites (13 files) to match reality:
- Drop the fake '% complete' figures everywhere in favor of Implemented /
  In-Progress / Planned with concrete endpoint/feature lists.
- Phase 2.8 -> Implemented; add /api/interactions/* and /api/auth/{refresh,
  logout} to the endpoint lists; fix 'Rust 1.93' -> edition 2021.
- Add a Security section (token_version validation, hashed refresh-token
  persistence, fail-fast config, real-IP audit) and correct the test-coverage
  and deployment claims to reality.
- New canonical docs/development/CI-CD.md (4 jobs: format/clippy/build/test,
  mongo service, no docker-build + why).
- README, docs/README, product/{STATUS,ROADMAP,PROGRESS,README,introduction},
  implementation/README, development/README, testing/README, AI_AGENT_GUIDE,
  .cursorrules, .gooserules all updated.

Verified: greps for 'Phase 2.8 (Planning)', 'PLANNING (0%)', 'Rust 1.93',
'91%/10%/85% complete', and 'docker-build' return nothing outside docs/archive;
all internal doc links resolve; backend/src untouched (cargo build clean).
This commit is contained in:
goose 2026-06-27 16:02:16 -03:00
parent bd1b7c2925
commit 17efc4f656
119 changed files with 469 additions and 17801 deletions

View file

@ -1,21 +1,22 @@
# Development Progress Dashboard
**Last Updated**: 2026-03-09 10:43:00 UTC
**Last Updated**: 2026-06-27
> This dashboard uses qualitative status (Implemented / In Progress / Planned)
> rather than percentage estimates. For the authoritative breakdown see
> [STATUS.md](./STATUS.md).
---
## 📊 Overall Progress
## 📊 Overall Status
```
████████████████████████████████████████████░░░░░░░░ 75% Complete
```
| Component | Progress | Status | Updated |
|-----------|----------|--------|---------|
| **Backend** | ████████████████████████████████████░░ 91% | 🚧 Active | 2026-03-08 |
| **Frontend** | █████░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ 10% | 🚧 Early | 2026-03-01 |
| **Testing** | ████████████████████████████████░░░░░ 85% | ✅ Good | 2026-03-08 |
| **Deployment** | ████████████████████████████████████ 100% | ✅ Ready | 2026-02-20 |
| Area | Status |
|------|--------|
| **Backend** | ✅ Phase 2.x feature-complete (through drug interactions); deployed on Solaria. |
| **Security** | ✅ Hardening pass complete (token-version validation, hashed refresh tokens, fail-fast config, real-IP audit). |
| **Tests** | ✅ 18 unit + 13 integration (auth + medication), CI-gated with MongoDB. |
| **Frontend** | 🚧 Early — Login/Register + API/store layer; router not yet wired. |
| **Deployment** | 🚧 Operational on Solaria; Docker image built manually (not in CI). |
---
@ -39,19 +40,13 @@
---
### Phase 2: Backend Development 🚧 91%
```
█████████████████████████████████████████████░░░░░ 91%
```
### Phase 2: Backend Development ✅ IMPLEMENTED
**Started**: 2025-Q4
**Estimated Completion**: 2026-03-31
**Current Phase**: 2.8 - Drug Interactions
**Started**: 2025-Q4
**Status**: All planned 2.x phases implemented (including drug interactions).
**Open follow-ups**: rate limiting (stub), reminders/analytics/export (Phase 2.8 stretch items), frontend.
#### Phase 2.1-2.5 ✅ 100%
```
██████████████████████████████████████████████████ 100%
```
#### Phase 2.1-2.5 ✅ Implemented
**Completed**: 2026-02-15
@ -62,22 +57,16 @@
- [x] Permission-based access control
- [x] Share management
#### Phase 2.6 ✅ 100%
```
██████████████████████████████████████████████████ 100%
```
#### Phase 2.6 ✅ Implemented
**Completed**: 2026-02-20
- [x] Rate limiting
- [x] Account lockout policies
- [x] Security audit logging
- [x] Session management
- [ ] Rate limiting (middleware is a stub — deferred)
#### Phase 2.7 🚧 91%
```
█████████████████████████████████████████████░░░░░ 91%
```
#### Phase 2.7 ✅ Implemented
**Completed**: 2026-03-08
@ -86,23 +75,21 @@
- [x] Health statistics tracking
- [x] Lab results storage
- [x] OpenFDA integration
- [x] Comprehensive testing
- [ ] Full integration testing (9%)
#### Phase 2.8 📋 0%
```
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ 0%
```
#### Phase 2.8 ✅ Implemented (core)
**Planned**: 2026-03-10 to 2026-03-31 (2-3 weeks)
- [x] Drug interaction checking (`/api/interactions/check`, `/check-new`)
- [ ] Automated reminder system *(not started)*
- [ ] Advanced health analytics *(not started)*
- [ ] Healthcare data export (FHIR, HL7) *(not started)*
- [ ] Medication refill tracking *(not started)*
- [ ] Caregiver access *(not started)*
- [ ] Drug interaction checking
- [ ] Automated reminder system
- [ ] Advanced health analytics
- [ ] Healthcare data export (FHIR, HL7)
- [ ] Medication refill tracking
- [ ] User preferences
- [ ] Caregiver access
#### P0/P1 Security + Tests ✅ Implemented
- [x] token_version validation, hashed refresh-token persistence, `/refresh` + `/logout`
- [x] Fail-fast config (`APP_ENVIRONMENT`), real client-IP audit
- [x] Handler `.unwrap()` cleanup; integration tests rewritten against a test DB
---
@ -221,10 +208,9 @@
- [x] Revoke session
- [x] Revoke all sessions
### Drug Interactions 📋 0%
- [ ] Check interactions
- [ ] Check new medication
- [ ] Get interaction details
### Drug Interactions ✅ Implemented
- [x] Check interactions (`POST /api/interactions/check`)
- [x] Check new medication (`POST /api/interactions/check-new`)
---
@ -232,61 +218,59 @@
| Handler | Status | Endpoints | Coverage |
|---------|--------|-----------|----------|
| **auth** | ✅ Complete | 5 | 100% |
| **users** | ✅ Complete | 6 | 100% |
| **medications** | ✅ Complete | 7 | 100% |
| **health_stats** | ✅ Complete | 6 | 100% |
| **lab_results** | ✅ Complete | 6 | 100% |
| **shares** | ✅ Complete | 4 | 100% |
| **permissions** | ✅ Complete | 1 | 100% |
| **sessions** | ✅ Complete | 3 | 100% |
| **interactions** | 📋 Planned | 2 | 0% |
| **health** | ✅ Complete | 1 | 100% |
| **auth** | ✅ Complete | 6 (incl. refresh, logout) | implemented |
| **users** | ✅ Complete | 6 | implemented |
| **medications** | ✅ Complete | 7 | implemented |
| **health_stats** | ✅ Complete | 6 | implemented |
| **lab_results** | ✅ Complete | 6 | implemented |
| **shares** | ✅ Complete | 4 | implemented |
| **permissions** | ✅ Complete | 1 | implemented |
| **sessions** | ✅ Complete | 3 | implemented |
| **interactions** | ✅ Complete | 2 | implemented |
| **health** | ✅ Complete | 1 | implemented |
**Total**: 41 endpoints implemented, 2 planned
**Total**: 41 endpoints implemented.
---
## Test Coverage
### Backend Tests
- **Unit tests**: 90% coverage
- **Integration tests**: 85% coverage
- **API endpoint tests**: 95% coverage
- **Security tests**: 80% coverage
- **Unit tests**: 18 tests (`cargo test --lib`) — client-IP, JWT, refresh hashing, token-version cache, services.
- **Integration tests**: 13 tests (`cargo test --test auth_tests --test medication_tests`) — in-process against an isolated test DB; cover auth, refresh rotation, logout, password-change invalidation, medication CRUD.
### Frontend Tests
- **Unit tests**: 20% coverage (early stage)
- **Integration tests**: 0% (not started)
- **E2E tests**: 0% (planned)
- Not started (frontend itself is early stage).
---
## Milestones
### ✅ Completed
1. ✅ **Milestone 1**: Foundation (2025-Q4)
2. ✅ **Milestone 2**: Core Features (2026-02-15)
3. ✅ **Milestone 3**: Security Hardening (2026-02-20)
4. ✅ **Milestone 4**: Health Data Features (2026-03-08, 91%)
1. ✅ Foundation (2025-Q4)
2. ✅ Core Features — Phases 2.12.5 (2026-02-15)
3. ✅ Security Hardening — Phase 2.6 (2026-02-20)
4. ✅ Health Data Features — Phase 2.7 (2026-03-08)
5. ✅ Drug Interactions — Phase 2.8 (core)
6. ✅ P0/P1 Security + Test rewrite
### 🎯 Up Next
5. 📋 **Milestone 5**: Drug Interactions & Advanced Features (2026-03-31)
### 🚧 Up Next
7. 🚧 **Phase 3 — Frontend**: wire router, build dashboard + feature UIs.
### 🔮 Future
6. 🔮 **Milestone 6**: Frontend Complete (2026-Q3)
7. 🔮 **Milestone 7**: Mobile Apps (2026-Q4)
8. 🔮 **Milestone 8**: AI/ML Features (2027)
8. 🔮 Phase 2.8 stretch: reminders, analytics, export, caregiver access.
9. 🔮 Phase 4 — Mobile apps.
10. 🔮 Phase 5 — Integrations, AI/ML.
---
## Timeline Visualization
```
2025-Q4 2026-02 2026-03 2026-Q2 2026-Q3 2027
2025-Q4 2026-02 2026-03 2026-06 next later
├──────────┼──────────┼──────────┼──────────┼──────────┼──
Phase 1 2.1-2.5 2.6-2.7 2.8 Phase 3 Phase 4
(100%) (100%) (91%) (0%) (0%) (0%)
Phase 1 2.1-2.5 2.6-2.7 2.8 + Phase 3 Phase 4/5
+P0/P1 security frontend
```
---
@ -300,7 +284,8 @@ tokio = "1.41.1"
mongodb = "2.8.2"
jsonwebtoken = "9.3.1"
reqwest = "0.12.28"
tower-governor = "0.4.3"
pbkdf2 = "0.12.2"
sha2 = "0.10" # refresh-token hashing
```
### Frontend (TypeScript/React)
@ -319,26 +304,20 @@ tower-governor = "0.4.3"
## Next Steps
### Immediate (This Week)
1. ✅ Update STATUS.md with current progress
2. ✅ Align ROADMAP.md with STATUS
3. ✅ Expand README.md with quick start
4. 📋 Start Phase 2.8 implementation
### Immediate
1. 🚧 **Phase 3 — Frontend**: wire the React Router, build the dashboard and feature UIs.
2. 📋 Rate limiting (the middleware is currently a stub).
3. 📋 Env-var/port convention cleanup across `.env` / docker-compose / config loader.
### Short-term (This Month)
5. 📋 Implement drug interaction checking
6. 📋 Build automated reminder system
7. 📋 Create advanced health analytics
8. 📋 Add healthcare data export
### Short-term
4. 📋 Phase 2.8 stretch: automated reminders, advanced analytics, data export.
5. 📋 Docker image build automation (currently manual — CI can't run DinD).
### Medium-term (Next Quarter)
9. 🔮 Complete Phase 2.8
10. 🔮 Begin Phase 3 (Frontend)
11. 🔮 Build dashboard UI
12. 🔮 Implement data visualization
### Medium-term
6. 🔮 Complete Phase 3 (frontend).
7. 🔮 Begin Phase 4 (mobile).
---
**Last Updated**: 2026-03-09 10:43:00 UTC
**Next Review**: After Phase 2.8 completion
**Last Updated**: 2026-06-27
**Maintained By**: Project maintainers